1.Feng X, Zheng FF, Xu YF. Robust scheduling of a two-stage hybrid flow shop with
uncertain interval processing times[J]. International Journal of Production Research,
2016.54(12):3706-3717.
2.Feng X, Cheng YX, Zheng FF, Xu YF. Online integrated production–distribution scheduling
problems without preemption[J]. Journal of Combinatorial Optimization, 2016.31(4):1569-1585.
3.Feng X, Xu YF, Zheng FF. Online Scheduling for Electricity Cost in Smart Grid[C] The 9th Annual
International Conference on Combinatorial Optimization and Applications (COCOA), 2015,
Lecture Notes in Computer Science, 9486: 783-793. (EI: 20160101747082).
4.Feng X, Zheng FF. Integrated job scheduling with parallel-batch processing and batch deliveries [C].
The 7th Annual International Conference on Combinatorial Optimization and Applications (COCOA),
2013, Lecture Notes in Computer Science, 8287: 72-83. (EI: 20140617268511)
5.冯鑫,郑斐峰,徐寅峰.批加工生产配送二级供应链协同调度,系统管理学报,2015, 24(2): 275-279.
6.冯鑫,郑斐峰.面对单客户的生产与配送二级供应链协同调度探讨,运筹与管理,2014,23(4): 19-24.
论文题目:制造业供应链生产与配送二级协同调度
专业:管理科学与工程
学号:4112008029
公示时间:2016.4.29
公示地点:院图书馆
tyc234cc 太阳成集团教务中心